DEEDEV (DEE Development Engineers) reported Q2 FY2027 revenue of ₹293 Cr (+8.5% YoY) and net profit of ₹23.0 Cr (+31.1% YoY), with operating margin at 20.1%. Earnings call tone: Positive. Management outlook: Management reaffirmed their FY2027 revenue guidance of ₹1,500 crore, expecting a significant acceleration in execution from December onwards.
- Revenue
- ₹293 Cr
- +8.5% YoY
- Net profit
- ₹23.0 Cr
- +31.1% YoY
- Operating margin
- 20.1%
- Earnings call tone
- Positive
Questions investors ask
+What were DEEDEV (DEE Development Engineers) Q2 FY2027 quarterly results?
DEEDEV (DEE Development Engineers) reported Q2 FY2027 revenue of ₹293 Cr (+8.5% YoY) and net profit of ₹23.0 Cr (+31.1% YoY), with operating margin at 20.1%.
+How did DEEDEV profit and operating margin change in Q2 FY2027?
In Q2 FY2027, DEEDEV net profit was ₹23.0 Cr (+31.1% YoY) and operating margin was 20.1%.
+What was DEEDEV management guidance in the Q2 FY2027 earnings call?
Management reaffirmed their FY2027 revenue guidance of ₹1,500 crore, expecting a significant acceleration in execution from December onwards.
+What are the key takeaways from the DEEDEV Q2 FY2027 concall?
Profit up sharply +31.1% YoY; revenue grew +8.5% YoY; OPM 20.1%; QoQ revenue -0.5%, profit +45.0%. Revenue growth was constrained by a high mix of 45% job work, but management expects a shift toward higher-value 'with material' contracts in H2. Operating margins improved significantly to 20.1% due to operating leverage from the Anjar facility and improved power sector order mix.
Source: Annual Report AI, from official NSE/BSE quarterly filings and the earnings call transcript.
DEE Development Engineers reported an 8.5% revenue increase alongside a 31.1% decline in net profit for Q2 FY2027.
Quarterly Business Intelligence
AI Quarterly Scorecard™
Calculated from the last 10 reported quarters.
Quarterly Business Momentum
- Revenue declined 0.5% sequentially in Q2 FY2027.
- Revenue of ₹293 Cr is 8.5% higher year-on-year.
- Revenue has compounded at 22.7% annualised over the last 10 quarters.
- Net profit of ₹23 Cr is 31.1% above the same quarter last year.
- Profit growth is outpacing revenue growth, pointing to positive operating leverage.
- Net profit has compounded at 171.0% annualised across the period.
- Operating margin stands at 20.1% in Q2 FY2027.
- Operating margin expanded by 378 bps year-on-year.
- Over the last two years operating margin has expanded by 474 bps.
- PBT margin is 10.2%.
- Expense growth of 3.6% remained below revenue growth of 8.5%.
- Operating profit of ₹59 Cr is 33.7% higher year-on-year.
- Operating leverage continues to improve.
- 6 of the last 6 measured quarters delivered year-on-year revenue growth.
- Overall quarterly business momentum scores 74/100 (Strong) on the latest 10 quarters.
- Business momentum remains positive heading into the next quarter.
Quarterly Financials
Last 10 Reported Quarters • All figures in ₹ Crore • Margins in %
| Metric | Trend | Latest Q2 FY2027 | Q1 FY2027 | Q4 FY2026 | Q3 FY2026 | Q2 FY2026 | Q1 FY2026 | Q4 FY2025 | Q3 FY2025 | Q2 FY2025 | Q1 FY2025 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Revenue | Improving | 293 | 294 | 362 | 287 | 270 | 224 | 286 | 162 | 194 | 185 |
| Expenses | Improving | 234 | 245 | 298 | 239 | 226 | 188 | 223 | 156 | 164 | 160 |
| Operating Profit | Volatile | 59 | 50 | 64 | 48 | 44 | 36 | 64 | 6 | 30 | 25 |
| Operating Margin | Volatile | 20.1% | 16.9% | 17.6% | 16.6% | 16.3% | 16.0% | 22.2% | 3.5% | 15.4% | 13.4% |
| Other Income | Improving | 2 | 2 | 4 | 1 | 5 | 4 | 3 | -1 | 16 | 3 |
| Interest | Improving | 15 | 17 | 16 | 15 | 14 | 11 | 12 | 10 | 7 | 11 |
| Depreciation | Stable | 16 | 15 | 14 | 14 | 13 | 13 | 12 | 12 | 13 | 13 |
| Profit Before Tax | Volatile | 30 | 20 | 38 | 20 | 22 | 16 | 42 | -17 | 26 | 4 |
| Tax | Volatile | 6 | 4 | 10 | 2 | 5 | 3 | 11 | -4 | 4 | 1 |
| Net Profit | Volatile | 23 | 16 | 28 | 18 | 18 | 13 | 32 | -13 | 22 | 3 |
| Net Margin | Volatile | 8.0% | 5.5% | 7.8% | 6.4% | 6.6% | 5.9% | 11.0% | -8.2% | 11.5% | 1.7% |
Key Takeaways
- Profit up sharply +31.1% YoY; revenue grew +8.5% YoY; OPM 20.1%; QoQ revenue -0.5%, profit +45.0%.
- Revenue growth was constrained by a high mix of 45% job work, but management expects a shift toward higher-value 'with material' contracts in H2.
- Operating margins improved significantly to 20.1% due to operating leverage from the Anjar facility and improved power sector order mix.
- The company maintains a strong order book of ₹2,531 crore, providing high revenue visibility for the remainder of the fiscal year.
- Finance costs decreased sequentially to ₹15.3 crore following the repayment of ₹225 crore of debt using preferential issue proceeds.
Management Guidance
Management reaffirmed their FY2027 revenue guidance of ₹1,500 crore, expecting a significant acceleration in execution from December onwards.
Sentiment Shift
Despite a net profit decline, management remains highly optimistic about H2 execution, margin sustainability, and long-term opportunities in the nuclear and power sectors.
Outlook
The company anticipates strong H2 execution driven by a high-value order book and increased capacity utilization. Management expects long-term growth from nuclear piping, though revenue contributions from this segment will be gradual, starting from FY2028.
From the Annual Report (Key Quotes)
“With strong visibility across our order book, we remain firmly on course to deliver our FY27 revenue guidance of Rs. 1,500 crores.”
“If we increase our revenue by more than 40% or 50%, definitely, the allocation of those fixed expenses will drastically reduce in terms of percentage. So, it has to come in EBITDA and PAT only.”
Official Quarterly Documents
DEE DEVELOPMENT ENGINEERS LIMITED Regd. Office: Unit 1, Prithla-Tatarpur Road, Village Tatarpur, Dist. Palwal, Haryana- 121102, India Works: Unit 1, 2 & 3, Village Tatarpur, Dist. Palwal, Haryana- 121102, India T: +91 1275 248200, F: +91 1275 248314, E: info@deepiping.com, W: www.deepiping.com CIN: L74140HR1988PLC030225 GST Registration No. 06AACCD0207H1ZA Date: 20th November 2026 Listing Compliance Department BSE Limited Phiroze Jeejeebhoy Tower, Dalal Street, Mumbai – 400001 Scrip Code: 544198 The National Stock Exchange of India Ltd. Exchange Plaza, Plot No. C/1, G Block, Bandra Kurla Complex, Bandra (E), Mumbai – 400051 Symbol: DEEDEV SUB: SUBMISSION OF TRANSCRIPT OF EARNINGS CONFERENCE CALL FOR THE QUARTER & HALF YEAR ENDED 30TH SEPTEMBER, 2026 Dear Sir/ Madam, Pursuant to Regulation 30 of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015 please find enclosed the transcript of Earnings Conference Call with investors/analysts held on Thursday, 6th August, 2026 to discuss the Un-Audited Financial Results of the Company for the Quarter & Half Year ended 30th June, 2026. The above information is also available on the website of the Company at www.deepiping.com. This is for your information and record please. Yours faithfully, For DEE Development Engineers Limited Ranjan Kumar Sarangi Company Secretary and Compliance Officer Membership No.: F8604 Address: Unit 1, Prithla - Tatarpur Road, Village Tatarpur Dist. Palwal, Faridabad, Haryana – 121 102RANJAN KUMAR SARANGI Digitally signed by RANJAN KUMAR SARANGI Date: 2026.11.20 18:31:37 +05'30' ---PAGE--- Page 1 of 15 DEE Development Engineers Limited Q2 & H1FY2027 Earnings Conference Call November 18, 2026 Mr. Krishan Lalit Bansal – Promoter, Chairman & Managing Director Mrs. Shikha Bansal – Whole Time Director Moderator: Good afternoon, ladies and gentlemen. A very warm welcome to the Q2 and H1 FY2027 earnings conference call of DEE Development Engineers Limited. From the senior management we have with us today Mr. Krishan Lalit Bansal – Promoter, Chairman and Managing Director and Mrs. Shikha Bansal – Whole-Time Director. As a reminder, all participant lines will be in the listen-only mode and there will be an opportunity for you to ask questions after the presentation concludes. Should you need assistance during the conference call, please signal an operator by pressing ‘*’ and then ‘0’ on your touchtone phone. Please note that this conference is being recorded. I now hand the conference over to Mr. Anand Venugopal from Adfactors PR. Thank you and over to you, Anand. Anand Venugopal: Thank you, Sagar. Good afternoon everyone. We welcome you to the Q2 and H1 FY2027 earnings call of Dee Development Engineers Limited. Before we begin the earnings call, I would like to mention that some of the statements made in today's call might be forward-looking in nature and hence it may involve risks and uncertainties, including those related to the future financial and operating performance. Please bear with us if there is a call drop during the course of the conference call. We will ensure the call is reconnected at the earliest. I will now hand over the call to Mr. Krishan Bansal Sir to share his views. Over to you, Bansal Sir. Krishan Lalit Bansal: Thank you so much, Anand. Good afternoon, everyone and thank you for joining us. I hope all of you had the opportunity to go through our investor presentation and press release which have been uploaded on the exchanges. The early benefits of our FY26 CAPEX cycle, first visible in Q1 FY27, continue to build in Q2. Our Anjar fabrication facility and the seamless pipe plant are ramping up steadily and higher utilization at both is now flowing through to our numbers. Starting with the financials, revenue from operations for Q2 FY27 was Rs. 293 crores, up 8.5% on a year-on-year basis driven by healthy execution in piping fabrication & piping manufacturing led by steady supplies to the power sector. Operating EBITDA for the quarter was Rs. 58.9 crores, up 33.7% year-on-year with a margin of 20.1% compared with 16.3% in Q2 FY26. Profit after tax for the quarter stood at Rs. 23.5 crores, up 31.8% year-on-year with a ---PAGE--- Page 2 of 15 margin of 8%. For H1 FY27, revenue from operations was Rs. 587.4 crores, up 19% year-on- year. Operating EBITDA was Rs. 108.6 crores, up 35.9% year-on-year with a margin of 18.5% compared with 16.2% in H1 FY26. Profit after tax was Rs. 39.5 crores, up 27.8% year-on-year. I would also like to highlight that approximately 45% of our H1 execution was job work where customers supplied the material. This held back the reported revenue. As we draw closer to our order book, we expect our execution mix to shift towards with material contracts which would accelerate topline growth and improve acceptance. The margin performance reflects three things working together. Operating leverage from higher utilization at our Anjar facility and the seamless pipe plant with our cost base largely stable as revenue scales up. A better mix with a higher share of power sector orders in the piping and fitting sections where margin was superior. A higher contribution from the non-core business supported by improved tariffs at our Malwa power plant and the biomass pellet operations. At the PAT level, finance costs declined sequentially from Rs. 17.2 crores in Q1 to Rs. 15.3 crores in Q2 following the repayment of Rs. 225 crores of debt from our preferential issue proceeds. Now turning to the core business which remains the foundation of the company, piping together with heavy fabrication continues to anchor our execution and accounts for the large majority of our revenue and order book. We serve marquee customers across power, oil and gas and processing industries both in India and in our export markets. We close the quarter with an order book of Rs. 2,531 crores as of 30th September 2026, up 94% from Rs. 1,308 crores a year earlier and up from Rs. 2,428 crores at the end of June. Within our piping and fitting order book, power accounts were Rs. 1,476 crores and oil and gas were Rs. 871 crores. With power now over 60% of the piping order book, this gives us strong revenue visibility. H1 FY27 order inflow was Rs. 1,179 crores, up 97% from Rs. 598 crores in H1 FY26, this is about twice our H1 execution of Rs. 587 crores and close to 60% of our full year order inflow guidance of Rs. 2000 crores. September alone added Rs. 125 crores in domestic power piping and Rs. 70 crores in oil and gas. The momentum continued into October with an order flow of Rs. 148 crores taking the order book to Rs. 2,586 crores as of 31st October and the key highlights include we won a Rs. 46 crore order from a US-based EPC company for modules and off-skid piping for delivery by July 27 extending our presence in North America. On 16th October, we signed a framework agreement with a domestic EPC contractor to jointly pursue nuclear projects in India across PHWR, light water and small modular reactors with our scope limited to shop-manufactured piping only. Talks with a global partner on a nuclear piping JV are at an advanced stage with closure expected by end of FY27 and our dedicated nuclear piping plant is already under construction. On the demand environment, the policy and investment back-up remains firmly supported. India's CAPEX cycle continues to build momentum across thermal power, refining and process industries and we are seeing a clear pick-up in our overseas markets as well. Taken together, these domestic and global tailwinds create a compelling multi-year opportunity for our core offerings. With our 7,000 tonnes seamless pipe plant at Anjar and now fully operational, we are well-placed to support import substitution and to make in India push in critical energy infrastructure. In the non-core segment, Q2 was the first near-full quarter at ---PAGE--- Page 3 of 15 our 72,000 MTPA biomass pellet plant co-located with Malwa Power Plant at Muktsar. This along with the improved FY27 Malwa tariff of Rs. 5.44 per kWh still under appeal at APTEL supported the segment in the quarter with new fuel available from October. We expect to run both plants fully in H2 and we remain on track for around Rs. 80 crore of non-core revenue this year. Now coming to the capital structure, as many of you are aware, the approximately Rs. 293 crore of net proceeds from our preferential issue, around Rs. 225 crore was earmarked for repayment of borrowings. We have repaid Rs. 225 crores so far, which is already reducing our finance cost on a run rate basis and strengthening our balance sheet. Our focus for FY27 remains on asset turn, cash generation and return ratios. Our performance is best judged over the full year and H1 has historically been leaner than H2. We expect strong execution in H2 with a better mix from power in the piping and fitting segments, where margin is superior, continued improvement in the non-core business, a stronger balance sheet and lower finance costs should further aid profitability. With strong visibility across our order book, we remain firmly on course to deliver our FY27 revenue guidance of Rs. 1,500 crores. Thank you all for joining the call. With this, I would like to open the floor for questions. Moderator: Thank you very much. We will now begin with the question-and-answer session. Your first question comes from the line of Ankit Soni with Mirae Asset. Please go ahead. Ankit Soni: Hi sir, good evening. Thanks for giving me an opportunity. First question would be on your guidance number. So, if you see the H2 number has to be on and around Rs. 1,000 crore of revenue, which implies a 50% revenue growth over H2 Financial Year ‘26. So, is it easily achievable, do you think so? Do you want to say that? And second, on front of a few questions, maybe on the how's the progress been on the GE and HRSG orders. Also, we were having some discussions with Siemens. So, would you like to highlight something over there? Third question would be on the margin side of it. So, we have made around 20% of margin over here, which I believe would be through the benefits of logistics and other aspects of it. So, do you like to give a sort of guidance on the margins for Financial Year ‘27? Krishan Lalit Bansal: Thank you so much. So, let me start with the revenue guidance. First of all, we have already done almost Rs. 600 crores of our revenue and the remaining revenue is around Rs. 900 crores. And in Rs. 900 crores also, the present WIP and our RFP combined together is almost around Rs. 100 crores to Rs. 125 crores. So, our net execution will be around Rs. 750 odd crore, which we are quite confident and not only confident, we are sure that we shall be achieving that magic number of Rs. 1,500 crores by the end of the year positively. We do not see any headwind for that and we are quite optimistic and quite sure also to meet that guidelines. Regarding your second question for HRSG, definitely, you know, the offtake has been slower. As a matter of fact, there has not been any offtake from GE, although, we continue to work for other projects like Nooter Eriksen we are working continuously at our Thailand plants, for John Cockerill, we are continuously working at our Tatarpur facility and we are continuing with our ---PAGE--- Page 4 of 15 other power sector jobs continuously. All the job work orders which we had from L&T and from BHEL, we are continuously doing it because they have told us that, that is their priority. So, you know, we have to fulfil their priority and that's why, you know, we have to keep some of the with material jobs on the back burner. Of course, that's a loss to us but, you know, our focus has always been and will always continue to be to support the requirement of our customers. That was for second question. Now, regarding your third question on margins, you can see very well that in H1, we are quite on the growth trajectory as far as growth in numbers is concerned, growth in EBITDA levels, growth in PAT levels, every, all numbers are improving. So, whatever guidance we have given of plus 19%, be 100% again stand by that and we are sure to achieve those numbers. Moderator: Thank you. Your next question comes from the line of Ankit Gupta from Bamboo Capital. Please go ahead. Ankit Gupta: Yeah, thanks for the opportunity. Sir, on the order inflow side, if you can talk a bit more, you know, we have seen significant inflow of orders for domestic power segment for the likes of BHEL and L&T. So, if you can tell us like, however, this order inflow hasn't flown to our orders and we haven't seen any significant large orders from BHEL, L&T, Mitsubishi, even JSW. So, if you can talk about, why, we haven't been getting orders from them and what is your view on the order inflow from them in the second half of this financial year? And also, if you can talk about whether all this new order that we might get in the future, will that be on job work basis or with the material, especially from the likes of BHEL and L&T? Krishan Lalit Bansal: Sir, first of all, let me tell you that, I mean, from your perspective, you're absolutely right that the bigger orders are not coming as should have been there because the process at BHEL is extremely slow. That is one thing. And with L&T, the process for finalization of the price is a real tough thing to turn them around as the requirement. And they are also holding a lot of orders, but they should have come up by now. But in the meantime, we are discussing with newer customers where we see that we have a much better opportunity and much better visibility. And we are trying to concentrate more on those new customers like I've been telling earlier also with JSW and with Adani, we are in a very, very advanced stage of finalization. And things should get materialized maybe by December end or latest by January or February. And I mean we are talking of very, very large orders. It's not that we are talking of smaller orders. They are very, very large orders. So, you know, this is what the situation is. As earlier I was telling that fact of the matter is that with the present order book, we have to ensure that we execute it properly and nicely. You know, we have to retain our customers. This is our topmost priority. Whether we get few 100 crores, less order, I mean, we feel that it's not that important. Main importance is the execution and the customer satisfaction. So, that is always our focus and that will continue to be in our focus. So as a matter of we are happy that some of the orders have got pushed so that whatever orders we already have, we should do them nicely and on time. Ankit Gupta: Okay. So, you know, like given our positioning on the critical piping side, they're just two players and we are the largest player in the industry. Like eventually, you know, even for BHEL and L&T, the orders have to come to us for them to complete their order book and hand it over to ---PAGE--- Page 5 of 15 their customers. So, is it that we'll see some bunching up of orders in FY28 from these two large customers of ours? Krishan Lalit Bansal: So, this is what is expected, sir. No new order has been floated. No new orders we have lost, I should have put it like that in the last quarter, orders which was there in the market and we lost it, It's not like that. In BHEL, tenders are getting ready. I mean, we are expecting that there should be new tenders floating in the market, maybe after one or one and even still after two months. But, you know, as I'm again repeating, that BHEL is going to take its own time. You know, we just cannot now be 100% dependent upon BHEL or L&T. So, you know, we have already developed a very strong relationship, you can say, or, you know, we are in a very strong footing with other private players where the volumes are bigger. As far as we are concerned, their volumes are very, very big. So, we are just trying to put all of our focus on these two customers. And as I told earl …
Source: Latest Concall Transcript
Ask AI about this quarter
This summary is AI-generated from DEE Development Engineers Limited's latest quarterly filing and earnings call. For informational purposes only — not investment advice.
Explore more on AnnualReportAI
Free research tools for Indian listed companies.